Ethiopia-Kenya Power System Interconnection Project

Ethiopia and Kenya
Soluções vinculadas
Energia e gás

In the frame of the EAPP (East African Power Pool) master plan, a power transmission line has been constructed between Ethiopia and Kenya in order to connect the national power grids of both countries. This transmission line allows the use of the important hydropower potential of Ethiopia in the whole region. Lahmeyer International has been supervising  the construction of a DC power transmission line. The length of the line is more than 1000 km long and is contracted in 5 lots. One further lot comprises the construction of the two substations for the conversion of 400 kV AC (Alternative Current) to 500 kV DC (Direct Current), the adjacent 400 kV AC substations in 1 ½ circuit breaker configuration, two Ground Electrode Stations and the connection of the 400 kV AC substations to the national power grids. The project has been financed for the most part by AFD (African Development Bank) and World Bank.

Cliente EEP - Ethiopian Electric Power
Local Ethiopia and Kenya
Período 2013 - 2018
Capacidade 2,000 MW

Services Provided

With the trusted expertise of Lahmeyer International

Subdomínios vinculados

Os subdomínios vinculados são:
Transmissão de extra-alta voltagem Planejamento de transmissão