Assiut New Barrage Environmental Management

Egypt
Soluções vinculadas
Água & Hidroenergia
Desenvolvimento Urbano e Meio Ambiente

The New Barrage in Assiut, 350 km south of Cairo on the Nile River in Egypt, will replace the existing barrage. The Environmental Impact Assessment concluded that the project required substantial environmental mitigation measures due to the significant changes introduced to the fragile Nile River ecosystem. Long-term technical assistance to the project owner to manage the project’s environmental and social impacts was provided.

Cliente Ministry of Water Resources and Irrigation (MWRI), Ministry of Electricity and Energy
Local Bani Morr, Markaz El-Fath, Assiut Governorate, Egypt
Período 2008 - ongoing
Capacidade 32 MW, 440 m³/sec irrigation water supply

Services Provided

with the trusted expertise of Lahmeyer International

Subdomínios vinculados

Os subdomínios vinculados são:
Irrigação Consultoria ambiental e social Vias navegáveis e fluviais Avaliações e redução do impacto ambiental e social