1,208 MW RLNG Based Power Plant at Haveli

Pakistan
Soluções vinculadas
Energia e gás

The Government of Pakistan was planning to install a 1,208 MW (net) CCPP base load power plant fired with re-gasified liquefied Natural Gas (RLNG) at Haveli Bahadur Shah - Jhang Shorkot. On 30 April 2018 the combined cycle gas and steam power plant went into operation with one of the highest net efficiency rates worldwide.

Cliente Government of Pakistan via National Power Parks Management Co. (PVT.) Ltd. (NPPMCL)
Local Pakistan
Período 2015 – 2018
Capacidade 1,208 (net) MWel

Services provided

With the trusted expertise of Lahmeyer International